Date
|
| |
| Customer Information |
Company
|
Contact
|
Position
|
Address
|
| |
Email
|
Delivery Address
|
Desired delivery time & commissioning
|
| Heating Requirements Needed |
|
Melting of ice in aggregates at receiving hopper(s) |
|
Melting and heating of aggregates in aggregate bin(s) |
|
Warm dosing water to mixer(s) |
|
Warm utility water for plant or other
|
Heat for control room, offices, maintenance or production facility, other:
Please describe and provide cu. ft. per building where heat is required:
|
|
Mixer truck wash area (how many)
|
|
Mixer truck saddle tank fill area (how many)
|
|
Other (describe)
|
| |
| Curing Requirement |
|
Hollow core slab & bed heating (# of beds)
(size?.)
|
|
Pre-cast mold or form heating (# of beds or molds)
(size?.)
|
|
Curing chamber(s) How many
Cu. ft.
Product
|
|
Other
|
Please describe heat media needed for each curing bed, mold or chamber (hot air, steam, radiant, re-circulated water/glycol for outside curing, re-circulated hot water for inside curing, or other:
|
| |
| Technical Data Needed |
| Batch plant type (ready-mix, pre-cast, pipe, paver, block etc.):
|
| Batch plant capacity: cu. yds/day max
cu. yds/hour max.
|
| Mixer type, output per batch (cu. yds.):
|
| Receiving hopper(s): Volume/Size
How many?
|
| Aggregate bins: Tons each
How many?
|
Are aggregate bins located inside plant or outside?
Inside
Outside |
Do you use water batcher or water meter to mixer?
Water Batcher
Water Meter |
Does the plant have separate hot and cold water?
Yes
No |
| |
| TURBOMATIC™ Unit |
| Container Color (www.ralcolor.com)
|
| Layout (see chart below): Standard (see chart below)
Other:
|
Fuel:
Natural Gas
Oil
Combination |
Oil Tank:
Included
Not included |
Oil Tank Type
Inside Turbo-Container
Separate Tank |
TURBOMATIC™ Installation:
(outdoors / container)
(inside / rack) |
| Plant voltage:
|
Do you have any blueprints available to us if this project is an existing plant?
Yes
No |
| |
POLARMATIC will design a system to heat all bin, silo, hopper, water and batch/production plant heating systems and will supply a list of piping requirements which your local plumbing / heating specialist can install. We offer our own installation, commissioning and start-up services at additional cost. Electrical service is the sole responsibility of the customer. |
| |
| TURBOMATIC™ standard layout options |
| (Note! The TURBO-layout defines the location of the side entrance door and the direction both the entering and exit pipes. If not specified we will supply and deliver the A2 layout which is most common.) |
 |
| |
|
| |